
INDUSTRY APPLICATIONS
INDUSTRY APPLICATIONSHigh-altitude project in Tibet- ATA medium voltage soft starter
Release time:
2024-12-16 16:42












Project Introduction
The construction site of this project is located in Jiamaxiang, Mozhugongka County, Lhasa City, Tibet, which is a high-altitude area with an elevation of over 4500 meters. The medium-voltage soft start equipment has been specially designed and optimized to adapt to the climatic conditions and environmental factors of high-altitude areas. Regardless of harsh environments such as high temperatures, low temperatures, high altitudes, or low pressures, advanced control technologies and materials are used to maintain stable operating conditions in high-altitude areas where the air is thin and heat dissipation conditions are poor. This ensures the stability and reliability of the equipment.
On-site Load
10kV 630kW Water Pump 4 units;
10kV 630kW Fan 3 units;
10kV 800kW Fan 6 units;
10kV 1800kW Water Pump 4 units;
10kV 5000kW Water Pump 9 units.
Previous Page
Next Page
Previous Page
Next Page
Sorry,当前栏目暂无内容!
您可以查看其他栏目或返回 首页
Sorry,The current column has no content!
You can view other columns or return Home
National Service Hotline
Company address: No.38, Lugu Lufeng Road, Changsha High-tech Development Zone
Email:ataqb@atawindow.com